Order no. : 175436

Mobile scaffolding, 1.35 × 3.0 m, with chassis bar and double platform.

€ 6,340.00
RRP without VAT

Specifications

Working height
6.66 m
Scaffolding height
5.93 m
Platform height
4.66 m
Platform width
1.35 m
Platform length
3 m
Load capacity
2 kN/m2
Weight
264 kg
Indoor use, central installation
possible & allowed
Indoor use, lateral installation
possible & allowed
Outdoor use, central installation
possible & allowed
Outdoor use, lateral installation
possible & allowed
Ballasting of scaffolding, indoor, central installation
0 kg
Ballasting of scaffolding, indoor, lateral installation
0 kg
Ballasting of scaffolding, outdoor, central installation
160 kg
Ballasting of scaffolding, outdoor, lateral installation
170 kg
Predecessor product
175435
Business division
MUNK Günzburger Steigtechnik
Article no.
175436
Price
€ 6,340.00
Notice
Accessories necessary to fulfil DIN EN 1004-1:2021

Information

  • Mobile scaffolding made of sturdy round aluminium tubing with welded frame parts
  • Large-format work area in width of 1.35 m
  • All scaffolding parts are also available individually as spare or extension parts
  • Galvanised steel chassis bar for flexible change of working position (location/setup)
  • Four Ø 200 mm swivel castors with centric load application, locking mechanisms and spindles
  • Scaffolding is easily moved along the chassis bar by loosening eight screws
  • Can be set up in central and lateral positions
  • Aluminium toe boards and railing frames with integrated knee board as safety railing
  • Can be set up and dismantled without tools thanks to push-fit connections and quick-release fasteners
  • Easy to handle thanks to individual lightweight parts
  • Different platform lengths available (1.80 / 2.45 / 3.0 m)
  • Working heights up to 13.45 m
  • GS-tested as per DIN EN 1004
  • Load class/scaffolding group 3: 2.0 kN/m²
  • In order to meet the requirements of DIN EN 1004-1:2021, this scaffold must be retrofitted
  • Option 1 - Conversion to MSG: 2 protective assembly railings telescopic (027991) are required for safe assembly, dismantling and conversion
  • Option 2 - Conversion to SG: Replace the railings lengthwise with safety railings for mobile scaffoldings in the appropriate scaffold length (2 pieces per platform level). Replace the guardrail frame at the front (top platform level) with railing frame SG at the front in the appropriate width. Omit the diagonal braces above the first platform
  • Corporate certification: ISO 9001
  • Corporate certification: EN 1090
  • Corporate certification: EcoVadis
  • RoHS
  • REACH
  • The MUNK Group complies with a Code of Conduct
  • The Supply Chain Act does not apply due to our size
  • The materials used are listed in the technical specification
  • Resource-saving production: own photovoltaic systems
  • Energy-efficient consumption during production: LED lighting
  • Repairability, durability and quality: 15-year warranty on series products made in Germany
  • Recyclability: Our products are mostly made of aluminium, steel or wood and can be fed directly into the recycling process.
  • Socially acceptable working conditions in production: fair wages, gender equality
  • Economical and recyclable packaging: no use of polystyrene, predominantly use of wood and cardboard, small amounts of plastic
  • No health hazards for the users
Scope of supply
  • 027901 - Push-fit frame, 1.35 m.: 4 x
  • 027957 - Railing lengthwise: 4 x
  • 027933 - Platform with trapdoor: 2 x
  • 027934 - Platform without flap: 2 x
  • 027911 - Toe board front side: 2 x
  • 027944 - Toe board long side: 2 x
  • 027938 - Diagonal brace: 4 x
  • 027936 - Horizontal strut: 2 x
  • 027923 - Chassis bar: 2 x
  • 027917 - Swivel castor with spindle: 4 x
  • 027940 - Step-on bracket: 1 x
  • 027902 - Push-fit frame, 1.35 m.: 2 x

Safety. Made in Germany.

Comparison table

Product name Mobile scaffolding, 1.35 × 3.0 m, with chassis bar and double platform. Platform height 4.66 m Mobile scaffolding, 1.35 × 3.0 m, with chassis bar and double platform. Platform height 5.78 m Mobile scaffolding, 1.35 × 3.0 m, with chassis bar and double platform. Platform height 6.62 m Mobile scaffolding, 1.35 × 3.0 m, with chassis bar and double platform. Platform height 7.74 m Mobile scaffolding, 1.35 × 3.0 m, with chassis bar and double platform. Platform height 8.58 m Mobile scaffolding, 1.35 × 3.0 m, with chassis bar and double platform. Platform height 9.70 m Mobile scaffolding, 1.35 × 3.0 m, with chassis bar and double platform. Platform height 10.54 m Mobile scaffolding, 1.35 × 3.0 m, with chassis bar and double platform. Platform height 11.62 m
Working height 6.66 m 7.78 m 8.62 m 9.74 m 10.58 m 11.7 m 12.54 m 13.62 m
Scaffolding height 5.93 m 7.01 m 7.89 m 9 m 9.85 m 10.97 m 11.81 m 12.89 m
Platform height 4.66 m 5.78 m 6.62 m 7.74 m 8.58 m 9.7 m 10.54 m 11.62 m
Platform width 1.35 m 1.35 m 1.35 m 1.35 m 1.35 m 1.35 m 1.35 m 1.35 m
Platform length 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m
Load capacity 2 kN/m2 2 kN/m2 2 kN/m2 2 kN/m2 2 kN/m2 2 kN/m2 2 kN/m2 2 kN/m2
Weight 264 kg 281 kg 348 kg 360 kg 431 kg 443 kg 515 kg 527 kg
Indoor use, central installation possible & allowed possible & allowed possible & allowed possible & allowed possible & allowed possible & allowed possible & allowed possible & allowed
Indoor use, lateral installation possible & allowed possible & allowed possible & allowed possible & allowed possible & allowed possible & allowed possible & allowed possible & allowed
Outdoor use, central installation possible & allowed possible & allowed possible & allowed possible & allowed not allowed not allowed not allowed not allowed
Outdoor use, lateral installation possible & allowed possible & allowed possible & allowed possible & allowed not allowed not allowed not allowed not allowed
Ballasting of scaffolding, indoor, central installation 0 kg 0 kg 0 kg 0 kg 0 kg 0 kg 0 kg 0 kg
Ballasting of scaffolding, indoor, lateral installation 0 kg 10 kg 10 kg 30 kg 30 kg 60 kg 60 kg 90 kg
Ballasting of scaffolding, outdoor, central installation 160 kg 280 kg 390 kg 530 kg - - - -
Ballasting of scaffolding, outdoor, lateral installation 170 kg 250 kg 330 kg 420 kg - - - -
Predecessor product 175435 - 175635 175735 175835 175935 175035 175135
Business division MUNK Günzburger Steigtechnik MUNK Günzburger Steigtechnik MUNK Günzburger Steigtechnik MUNK Günzburger Steigtechnik MUNK Günzburger Steigtechnik MUNK Günzburger Steigtechnik MUNK Günzburger Steigtechnik MUNK Günzburger Steigtechnik
Article no. 175436 175535 175636 175736 175836 175936 175036 175136
Price € 6,340.00 € 6,946.00 € 8,499.00 € 8,931.00 € 10,658.00 € 11,090.00 € 12,817.00 € 13,249.00
Notice Accessories necessary to fulfil DIN EN 1004-1:2021 Accessories necessary to fulfil DIN EN 1004-1:2021 Accessories necessary to fulfil DIN EN 1004-1:2021 Accessories necessary to fulfil DIN EN 1004-1:2021 Accessories necessary to fulfil DIN EN 1004-1:2021 Accessories necessary to fulfil DIN EN 1004-1:2021 Accessories necessary to fulfil DIN EN 1004-1:2021 Accessories necessary to fulfil DIN EN 1004-1:2021
Buy online
Technical changes and price changes reserved. Dimensions and weights are approximate values. Liability for errors and mistakes excluded. Illustrations similar, some illustrations show special equipment. Preview images are representative of a product family and may therefore differ visually from the actual product you are looking for, e.g. in terms of number of steps or material.

Suitable accessories

Alternatives